Builder: Tornado Group
Duration: 14 weeks
Project size: 700m2
Project Overview:
Together with Tornado Group, we delivered a tailored electrical fit-out for Catapult’s Melbourne headquarters—calibrated to the specific needs of labs, test areas and offices, and built to keep pace with their research, testing and day-to-day operations.
The installation included dedicated multiple dedicated circuits and Cat6A Siemon certificated data infrastructure to support equipment in the testing laboratory and broadcast bunker, Darkon Energy-efficient LED lighting and C-Bus smart controls which have been implemented to meet commercial sustainability standards, while Cleavertronics Exit & emergency system ensured compliance with building regulations. The electrical infrastructure installed provides surge protection and stable power distribution to support sensitive electronic equipment, maintaining reliable performance across all work zones.
Project Overview:
Builder: Tornado Group
Duration: 14 weeks
Project size: 700m2
Together with Tornado Group, we delivered a tailored electrical fit-out for Catapult’s Melbourne headquarters—calibrated to the specific needs of labs, test areas and offices, and built to keep pace with their research, testing and day-to-day operations.
The installation included dedicated multiple dedicated circuits and Cat6A Siemon certificated data infrastructure to support equipment in the testing laboratory and broadcast bunker, Darkon Energy-efficient LED lighting and C-Bus smart controls which have been implemented to meet commercial sustainability standards, while Cleavertronics Exit & emergency system ensured compliance with building regulations. The electrical infrastructure installed provides surge protection and stable power distribution to support sensitive electronic equipment, maintaining reliable performance across all work zones.



