Project Overview:

Builder: Harris HMC
Duration: May 2019 – August 2019
Project size: Admin Building – 395 Sqm and Chemistry – 600sqm

Elecflight was awarded this opportunity through Harris HMC following a competitive tender process. As a Clinical Learning environment this ‘Hospital Ward’ included an almost full spec Medelec installation with Meditek Esco bed head full integration bed head equipment which also included Camera and Audio Visual to monitor and train students. As a University standard Elecflight installed a fully Certified Siemon Cat6A FUTP data cabling solution, tested and certified using a Fluke DSX-5000 Cable Analyser. A new NHP Distribution Board was also installed to house the circuit protection devices for the refurbished area. This is currently the first of 3 projects happing in collaboration with Harris HMC at Federation University Berwick

Project Overview:

Builder: Harris HMC
Duration: May 2019 – August 2019
Project size: Admin Building – 395 Sqm and Chemistry – 600sqm

Elecflight was awarded this opportunity through Harris HMC following a competitive tender process. As a Clinical Learning environment this ‘Hospital Ward’ included an almost full spec Medelec installation with Meditek Esco bed head full integration bed head equipment which also included Camera and Audio Visual to monitor and train students. As a University standard Elecflight installed a fully Certified Siemon Cat6A FUTP data cabling solution, tested and certified using a Fluke DSX-5000 Cable Analyser. A new NHP Distribution Board was also installed to house the circuit protection devices for the refurbished area. This is currently the first of 3 projects happing in collaboration with Harris HMC at Federation University Berwick