Project Overview:

Builder: FDC
Duration: September 2019 – November 2019
Project size: 1600 sqm

  • Demolition and make safe services
  • Installation of Data Centre NHP Distribution Board with Grizz Bar Chassis
  • Architectural design Lighting
  • C-Bus control lighting
  • This was a fully specified job which required a very high-end finish without compromising on quality.

Oracle Australia commissioned FDC Constructions and Fitouts to complete the refit of 2 levels in the prestigious Heritage listed 140 William St building.

Elecflight installed by design LED strip lighting, pendants and suspended linear lights to highlight the modern styled fit out, complete with open work spaces, relaxed breakout and games areas, partial open ceilings and contemporary wall art visioned by Oracle.

In total over 500m of strip lighting was installed over the two levels fully controlled and automated through a Cbus and Dali integrated Lighting Control System.

A new NHP Grizzbar Distribution Board was installed to power Oracles new Data Centre that facilitates the backbone of the IT Cloud based business. This was a fully specified job, delivered on tight time frames to a high quality standard.

Project Overview:

Builder: FDC
Duration: September 2019 – November 2019
Project size: 1600 sqm

  • Demolition and make safe services
  • Installation of Data Centre NHP Distribution Board with Grizz Bar Chassis
  • Architectural design Lighting
  • C-Bus control lighting
  • This was a fully specified job which required a very high-end finish without compromising on quality.

Oracle Australia commissioned FDC Constructions and Fitouts to complete the refit of 2 levels in the prestigious Heritage listed 140 William St building.

Elecflight installed by design LED strip lighting, pendants and suspended linear lights to highlight the modern styled fit out, complete with open work spaces, relaxed breakout and games areas, partial open ceilings and contemporary wall art visioned by Oracle.

In total over 500m of strip lighting was installed over the two levels fully controlled and automated through a Cbus and Dali integrated Lighting Control System.

A new NHP Grizzbar Distribution Board was installed to power Oracles new Data Centre that facilitates the backbone of the IT Cloud based business. This was a fully specified job, delivered on tight time frames to a high quality standard.